Emergency work on the Heritage Bridge in Shannon
Main services provided
Development of the methodology and production of plans for the design and use of a work system to allow 3 workers to carry out the emergency work required to stabilise the adjacent bridge structure, which was deemed to be at high risk of collapse.
Why are we proud of it?
The degree of urgency, leaving little time to develop a safety method in the event of a bridge collapse, required a special method for an exceptional situation, all of which was achieved in a very short time.