Demolition

A demolition is a construction run backwards. We write the sequence, determine what must be supported before each removal, and verify stability in the intermediate states — the ones nobody calculated in the original design.

  • Demolition procedures
  • Work sequencing
  • Stability analysis during demolition

Erection

Erection procedures, temporary supports required at each stage, bridge girder placement plans and stripping methods. Edge-girder rotation analysis addresses the torsion that appears when the deck is poured asymmetrically.

  • Construction / erection procedures
  • Sequencing and bridge girder placement plan
  • Stripping methods
  • Bridge girder rotation analysis (edge-girder torsion)
  • Erection - NadeauSDM
  • Erection - NadeauSDM
Engineering documentation - NadeauSDM

Engineering Documentation

The paperwork that goes with the method: design calculations, temporary works drawings, shop sketches, certificates of conformity. This is what is handed to the resident engineer, the owner or the inspector, and what stays on file once the work is done.

  • Signed and sealed work method
  • Design calculations
  • Drawings and shop sketches
  • Certificates of conformity